Skip to content

Prepare 0.1.3 and close merge gate for coordinated rollout - #60

Merged
AppSolves merged 1 commit into
mainfrom
release/v0.1.3-maintenance
Nov 16, 2026
Merged

AppSolves merged 1 commit into
mainfrom
release/v0.1.3-maintenance

Conversation

@AppSolves

Copy link
Copy Markdown
Owner

Summary

Prepare the reviewed timeout/continuation fix (#59, merge d4e0dfefaa9a5afd77141b9a8c8994053b5bddfe) for the established immutable-pin maintenance window.

0.1.2 → 0.1.3 metadata
merge deployment gate → closed during coordinated pin cutover

Only package/lockfile, health/client metadata, changelog heading, deployment gate and its exact test expectation change. No credential, quota, repository policy, OAuth/browser flag or caller pin changes. Merging does not deploy; the closed gate is deployed only from reviewed main, followed by intent reconciliation and actual-merge-SHA pin preparation.

Evidence

  • Before: release metadata is 0.1.2 and the deployment merge gate is open.
    After: 0.1.3 metadata is consistent, and the gate/test expectation are closed for maintenance. npm run check: 267 tests, typecheck, lint and build passed.
  • Fix targeted review continuation and configurable execution timeouts #59 passed full GitHub CI and native scripted Docker/Codex acceptance. Live isolated TopkAPI review of 93 files/two commits/four images completed all six groups and synthesis in 10m45s, identifying tenant and stale-response regressions: https://github.com/AppSolves/TopkAPI/actions/runs/43940982178 . Small clean review with --timeout 60 completed against the final runner: https://github.com/AppSolves/TopkAPI/actions/runs/43943597407 . Both published exact-head, non-approving COMMENT reviews.
  • The 93-file live fixture has 1,668 changed lines; it is not equivalent to the production PR's roughly 8,700 lines and does not guarantee all future large reviews complete. The deterministic >12,000-line planner case separately checks lossless bounded grouping.
  • Test OAuth session revoked; original TopkAPI tree/vault restored; temporary Worker and D1 deleted. Production still has the prior reviewed deployment, with no active reviews or merge intents at preflight.

Merge Danger

Door: two-way

No migration. This commit intentionally closes merging when deployed; restore the gate only after all caller pins, Worker trust and OIDC checks match.

Blast Radius: deployment

Browser OAuth/hosted-inference flags stay disabled. Repository merge opt-in, explicit commands and protection rules are unchanged.

@AppSolves
AppSolves merged commit 2301802 into main Nov 16, 2026
4 checks passed
@AppSolves
AppSolves deleted the release/v0.1.3-maintenance branch November 16, 2026 20:03
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant